Customization: | Available |
---|---|
Warranty: | 12 Months / 30000 Kilometers |
Type: | Auto Clutch Bearing |
Still deciding? Get samples of US$ 20/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description | Hydraulic Clutch Release Bearings Central Slave Cylinder, Clutch Concentric Slave Cylinders |
Size | Inner Diameter: 29.8 mm Outside Diameter: 35 mm Height:97 mm Mounting Hole Qty: 3 Supplementary Information: without sensor Weight: 0.75 Kgs |
Application | JEEP, CHRYSLER |
JEEP : 4638465 JEEP : 4723875 JEEP : 4728060 JEEP : 53005967 JEEP : 53006068 JEEP : 83503383 JEEP : 83503384 |
CHRYSLER : 53005967 CHRYSLER : 53006068 CHRYSLER : 83503383 CHRYSLER : 83503384 JEEP : 04723875 JEEP : 04728060 JEEP : 4638464 |
CHRYSLER : 04723875 CHRYSLER : 04728060 CHRYSLER : 04728735 CHRYSLER : 4638464 CHRYSLER : 4638465 CHRYSLER : 4723875 CHRYSLER : 4728060 CHRYSLER : 4728735 |
LuK : 510 0012 10 LuK : 510 0056 10 LuK : 510 0014 10 LuK : LSC269 AKRON-MALO : 88676 FTE : ZA3504A1 |
BORG & BECK : BCS165 LUCAS : LCSC0124 NATIONAL : NSC0016 RYMEC : CSC1088530 SACHS : 3182 600 115 WESTLAKE : WCSC106 |
IAP QUALITY PARTS : 20410040 IAP QUALITY PARTS : 20410040P KAISHIN : SCJE002 LPR : 3252 RED-LINE : 25JE000 |
Car Models | Year | Engine | Displacement | Power | Type |
JEEP CHEROKEE (XJ) 2.5 | 1995-2001 | EPE | 2469 | 89 | Closed Off-Road Vehicle |
JEEP CHEROKEE (XJ) 2.5 4x4 | 1986-1990 | EPE | 2464 | 90 | Closed Off-Road Vehicle |
JEEP CHEROKEE (XJ) 2.5 SE | 1996-1999 | EPE | 2464 | 87 | Closed Off-Road Vehicle |
JEEP CHEROKEE (XJ) 4.0 4x4 | 1986-1990 | M400L | 3956 | 131 | Closed Off-Road Vehicle |
JEEP GRAND CHEROKEE I (ZJ, ZG) 4.0 i 4x4 (Z) | 1995-1999 | S01 | 3960 | 130 | Closed Off-Road Vehicle |
JEEP WRANGLER I (YJ, SJ_) 2.5 | 1988-1991 | E246L | 2464 | 76 | Open Off-Road Vehicle |
JEEP WRANGLER I (YJ, SJ_) 4.2 2WD | 1986-1990 | 4229 | 82 | Open Off-Road Vehicle | WRANGLER I (YJ, SJ_) 4.2 2WD |
Packaging Details | 1 piece in a single box 2 boxes in a carton 30 cartons in a pallet |
Nearest Port | Shanghai or Ningbo |
Lead Time | For stock parts: 1-5 days. If no stock parts: <20 pcs: 15-30 days ≥20 pcs: to be negotiated. |